Pyrolysis Technology Transfer
Project support from the initial feedstock assessment to installation, commissioning and handover. Scope and responsibilities are agreed for each site.
1. Define the project
Share the source and expected volume of feedstock, the location, available space and intended products. DMCBiochar can then discuss the relevant equipment configurations.
2. Review site conditions
Review material handling, storage, utilities, access and the proposed layout. The review identifies work to complete before equipment is installed.
3. Confirm a proposal
Agree on the configuration, scope of supply, customer-provided infrastructure, programme and items requiring separate approval.
4. Install the system
Coordinate installation, confirm access and utilities, and check that the site is ready for the agreed work.
5. Commission and train
Carry out the agreed checks and trial runs. Record findings against the configuration and trial conditions, and provide the agreed operating instruction.
6. Accept and hand over
Review the equipment and work against the agreed acceptance criteria. Transfer the documentation and confirm the support arrangements.